HERY AHMAD
Minggu, 13 April 2025
Minggu, 29 November 2015
Selasa, 27 Januari 2015
Senin, 07 April 2014
COVER SKRIPSI
PERBEDAAN WAKTU PENGERJAAN PADA
PEMOGRAMAN INCREMENTAL DAN ABSOLUTE MESIN
CNC MILLING TU - 3A
SKRIPSI
Diajukan Untuk Memenuhi Persyaratan Memperoleh
Gelar Sarjana Teknik Mesin Strata Satu (S1)
oleh
:
Ahmad
Suhaeri
41187001080010
JURUSAN
TEKNIK MESIN
FAKULTAS
TEKNIK
UNIVERSITAS
ISLAM ”45”
BEKASI
2013
BimBim_uYe
ABSTRACT
Purpose
of this study was to determine differences in processing time on incremental
and absolute programming CNC Milling Machine Training Unit 3 Axis.
This
research method is experimental. The results of this study indicate on
incremental and absolute program to get an average time of 4:17.20 seconds, and
programs to get the absolute average time of 4:20.60 seconds at a speed of ( F 100 m/minute).
Based
on the results obtained, it was concluded that the difference in processing
time on incremental and absolute programming CNC Milling Machine Training unit
3 Axis, get the difference in time 3:40 seconds, faster incremental programs in
the program compare absolute. Then to save the processing time on the
programming of CNC Mlling Machine Training Unit 3 Axis is more appropriate to
use an incremental program.
Keyword
: CNC Milling Machine Training Unit 3 Axis, speed cutting time, program
incremental and absolute, material selection polimer.
BimBim_uYe
Menyetujui,
LEMBAR PENGESAHAN SKRIPSI
PERBEDAAN
WAKTU PENGERJAAN PADA PEMROGRAMAN
INCREMENTAL DAN ABSOLUTE MESIN CNC MILLING
TU 3A
Nama : Ahmad Suhaeri
NPM : 41187001080010
Jurusan
: Mesin S1
Fakultas : Teknik
Bekasi,
28 November 2013
|
|
Mengetahui,
Ketua
Program Studi Teknik Mesin S1
H.
Ahsan, S.Pd,.ST.MT.
Ketua
Program Studi Teknik Mesin S1
Langganan:
Komentar (Atom)






