Senin, 07 April 2014

COVER SKRIPSI



PERBEDAAN WAKTU PENGERJAAN PADA PEMOGRAMAN INCREMENTAL DAN ABSOLUTE MESIN
CNC MILLING TU - 3A

SKRIPSI
Diajukan Untuk Memenuhi Persyaratan Memperoleh
Gelar Sarjana Teknik Mesin Strata Satu (S1)

 
 oleh :
Ahmad Suhaeri
41187001080010

JURUSAN TEKNIK MESIN
FAKULTAS TEKNIK
UNIVERSITAS ISLAM ”45”
BEKASI
2013

BimBim_uYe 


ABSTRACT


Purpose of this study was to determine differences in processing time on incremental and absolute programming CNC Milling Machine Training Unit 3 Axis.
This research method is experimental. The results of this study indicate on incremental and absolute program to get an average time of 4:17.20 seconds, and programs to get the absolute average time of 4:20.60 seconds at a speed of   ( F 100 m/minute).
Based on the results obtained, it was concluded that the difference in processing time on incremental and absolute programming CNC Milling Machine Training unit 3 Axis, get the difference in time 3:40 seconds, faster incremental programs in the program compare absolute. Then to save the processing time on the programming of CNC Mlling Machine Training Unit 3 Axis is more appropriate to use an incremental program.

Keyword : CNC Milling Machine Training Unit 3 Axis, speed cutting time, program incremental and absolute, material selection polimer.
  

BimBim_uYe



LEMBAR PENGESAHAN SKRIPSI

PERBEDAAN WAKTU PENGERJAAN PADA PEMROGRAMAN
INCREMENTAL DAN ABSOLUTE  MESIN CNC MILLING TU 3A

                                           Nama      : Ahmad Suhaeri      
                                           NPM       : 41187001080010   
                                           Jurusan  : Mesin S1
                                           Fakultas : Teknik

Bekasi, 28 November 2013
Pembimbing I


Drs. Agus Dudung, M.Pd
Dosen Pembimbing


 
Pembimbing II


H. Ahsan, S.Pd,.ST.MT. 
Dosen Pembimbing
.
D
 
Menyetujui,





Mengetahui,
Ketua Program Studi Teknik Mesin S1


H. Ahsan, S.Pd,.ST.MT.
Ketua Program Studi Teknik Mesin S1